500 person 2012 Undergroung Bunker Complex

Above ground portion of a 2012 Shetler

Surface Entrance to 2012 Underground Bunker

2012 Community Shelter Installation

2012 Entrance Chamber Before Concrete Shell Installation

Hardened Structures is a leader in EMP design mitigations

2012 Shelters

Hardened Structures Hardened Shelters LLC is the premier leader in 2012 Mitigation Shelter Designs. We have successfully completed several 2012 shelters, have several currently underway and are also working with 2012 book authors and experts on their own 2012 shelter projects.

As a specific Threat Event, the anticipated catastrophic effects resulting from 2012 are far greater than the anticipated effects from WMD’s, anarchy, climate change or any of the other specific Threat Events for which we have developed mitigation designs.

In general, the shelter should have independent sources of water, sewage, fuel, electricity, HVAC, food and supplies and all critical systems must include two back-up redundant systems. In some circumstances, the shelter location should be concealed from view and, to the extent reasonable, all air intakes/exhausts are to be camouflaged. The shelter should incorporate a minimum of two secret emergency exits. The design and construction of the shelter must be in accordance with the International Building Code (IBC).

Threat Assessment: While the shelter will be designed and constructed to mitigate the anticipated effects of 12/21/2012, no one knows for certain what, if anything will actually occur on this date. However, most engineers and scientists agree that for a fully protected 2012 shelter the following threats must be mitigated;

  1. 3-Bars Blast Overpressure of 45 psi
  2. Force 10 Earthquake in successions
  3. 450 MPH winds
  4. Extreme Gamma & Neutron attenuation from a 100 megaton air burst detonated 20 miles away
  5. Solar Flares with 1,000,000 volt EMP
  6. Flooding (complete submersion for 100 hours)
  7. Extreme External Fires at 1250 F for 10 days
  8. Magnetic Pole Shift
  9. Radiological, Chemical and Biological Weapons
  10. Forced Entry and Armed Assaults
  11. 12’ of snow and 10’ of rain
  12. 500 lb Hail Stones or flying debris at a speed of 100 mph

The shelter will generally function as a stand-alone underground fortress. Self Rescue supplies and Emergency Escape man-ways and extraction procedures must be included in the basic design as to allow radical movement of the structure and extreme surface conditions. If this shelter is forced to the surface it must be capable of surviving all of the above threats absent the protection of earth coverage. Post Attack Recovery Plans specific to the facility’s function/capabilities are to incorporate the anticipated after-effects of the Threat Event and allow for occupant survival ability and sustainability.

Our 20 years experience as engineers, architects and project managers in the shelter design/build industry has convinced us that the possible affects from a catastrophic 2012 Threat Event demands a Shelter Protection Program of a Herculean nature.

General Space Requirements: The shelter is anticipated to incorporate the following spaces: Bedrooms, Bathrooms, Air Locks, Decontamination Room, Kitchen, Den, Communal Space, Store Rooms, HVAC Equipment Room, Battery Room, 2-Emergency Escape Tunnels, Power Control Room with Generator, Firearms/Ammunition Vault and required fresh air intakes and exhausts.

Structural Requirements: The shelter must be designed to withstand 3-Bars, or 45 psi of applied blast overpressure. The shelter must retain structural integrity as it moves laterally or vertically underground. All penetrations thru the shelter envelope must utilize blast valves and blast doors. Concrete admixtures for moisture control and water penetration will be required as well as additional reinforcing detailing at all penetrations. A Mat-type 5000 psi cast-in-place concrete foundation is envisioned with concrete walls between 2’-00” to 4’-00” thick. A cast in place concrete ceiling approximately 3’-00” to 6’-6” thick is anticipated. A Blast suspension system is typically not incorporated.

Mechanical Requirements:

  1. The shelter must be designed to operate “off the grid” without outside utility support. The shelter will be connected to the existing electrical service and shall operate using utility electrical power when available.


    1. The main electrical power should be used to keep the Facility ready for occupation
    2. Primary power of approximately - 16 to 25Kw is required and should be geothermal water or radiator cooled generators. Possible future surface installations may need power for development, generator size determined after component selection.
    3. Small scale power generation will need to be provided to keep the Battery Banks charged during lock down
    4. Alternative Energy production shall be included i.e., P.V. Wind .etc...
    5. All internal systems should be run on 12-24or 48 Volt D.C and should be designed accordingly where possible, appliances should be duel fuel.
    6. All Power transfer, Generation and Inverters and Batteries must be protected by a Ferias cage from EMP surge of 1,000,000 volt minimum. All these components and internal appliances must be surge protected
    7. All Critical systems must have a manually operated Back up.
    8. De humidification of the air within the facility is a main consideration in all design and equipment choices. Humidity will degrade NBC and CO2 air supply filters at a ratio of 10to1, a filter good for 90 days at 5% humidity will only work at 95% humidity for as little as 9 days
    9. All external Ducts, Cables and Pipes need to be bonded into the ground system before any wall penetrations to protect internal environments and equipment from EMP Surge.
    10. Manual power generation capabilities shall be incorporated into the design.
    11. Independent Isolated Battery Back up system shall be designed into the system

  2. Air from external sources must be assumed to not always be available


    1. During a closed circuit operation CO2 absorption will require an internal recirculation system to return air to HVAC room for treatment. ”90Day”
    2. All internal air is to be Heated, Cooled, Dehumidified, Filtered, HEPPA and or UV
    3. All valves must have a fast acting closure mechanism capable of protection during complete submersion. Drainage for all system enclosures shall be provided.
    4. All air within the shelter should be capable of being completely replaced within a 5 min period for evacuation after a possible internal fire.
    5. All air locks are to have less than a 4 min cycle rate - 4 Full volume Exchanges
    6. Two supply systems will be required One during NBC Lockdown Fully Protected, this system should have the option of CO2 exchange. The second system will be for Non – NBC filtered air. This system is for Blast protected and Filtered air for those times when the external air is suitable for breathing. Sensors will need to be installed to immediately close the system as soon as a threat is perceived. NOTE: It is cost prohibitive to provide NBC protected air for a full year without considerable expense.
    7. 10Cm Per Hour is the recommended minimal air required for each inhabitant.
    8. Ambient temperatures of 72 to 78 Deg should be used as a goal
    9. We do not recommend that any air be introduced into the living spaces above 36” from floor height
    10. Air exchange Valves between rooms are recommended to be between Head height and lowest ceiling level.
    11. Air pick-ups for recirculation of air recommended to be within the Drop ceiling
    12. Relative humidity is recommended to be kept under 10% at all times and 5% during Lockdowns
    13. If heat exchange wells can’t be installed then adequate coils will be placed on the up hill side of the structure during backfill for HVAC systems.
    14. All external Ducts, Cables and Pipes need to be bonded into the ground system before any wall penetrations to protect internal environments and equipment from EMP Surge.
    15. The Cooling and Aspiration air required by the Generator must be kept completely separate from that of the shelter areas especially during discharge
    16. There must be secure access to the generator room for maintenance and repairs.

  3. Potable/Drinking water should be supplied from a deep well within the Structure


    1. All internal systems should be operated on 12-24or 48 Volt D.C whenever possible.
    2. Internal and external Water Supply tanks should be considered for heat exchangers to bring water supply closer to a useful temperatures
    3. Hand operated Back up systems should be included during design , for supply
    4. Filtration and treatment equipment is to be included in the design of the water supply system in case future contamination occurs
    5. A minimum of 5 Gallons per person per day is recommended
    6. Sewer pipes and air vents are to be protected from back pressure
    7. Grey water is recommended to be used to improve grounding potential of soils surrounding shelter
    8. All external Ducts, Cables and Pipes need to be bonded into the ground system before any wall penetrations to protect internal environments and equipment from EMP Surge.
    9. 30 Days of Water should be stored in an external tank allowing gravity feed into shelter for use during power outages. Hand pumping must be an option.
    10. Water must be monitored for contamination: Radiological Chemical and Biological before storage and distribution network.
    11. Drinking water wells will not be used for, or encroached on within 40’ of Geo Thermal wells If available a different depth for Drinking water (The Deepest) should be used from those of equipment cooling
    12. All sewer drain lines must be located below structure for gravity feed
    13. An option of a secondary Grey water disposal system for back up which should include a water treatment system for use in toilets and for wash down requirements if water becomes in short supply.

It is important to remember that the above shelter specifications are only a starting point in the comprehensive development of a Client Specific 2012 Shelter Protection Program. Please call us toll free at (877) 486-0084 for a free confidential consultation.

    Free Confidential
Consultation
Toll Free 877 486 0084
Copyright © 2010 Hardened Structures.  All rights reserved. Hosted and maintained by NetTek, LLC.
Underground Shelter | Underground Bomb Shelter | Underground Bunker | Underground Shelter System | NBC Shelter | NBC Underground Shelter | 2012 Underground Bunker | 2012 Underground Shelter | Shelter Systems | Underground Community | Survival Shelter | Bomb Shelter | Bomb Shelters | Storm Shelter | Fallout Shelter | Safe Room | Austin Bomb Shelter | Austin Fallout Shelter | Austin Safe Room | Austin Storm Shelter | Austin Survival Shelter | Austin Underground Bunker | Austin Underground Shelter | Baltimore Bomb Shelter | Baltimore Fallout Shelter | Baltimore Safe Room | Baltimore Storm Shelter | Baltimore Survival Shelter | Baltimore Underground Bunker | Baltimore Underground Shelter | Charlotte Bomb Shelter | Charlotte Fallout Shelter | Charlotte Safe Room | Charlotte Storm Shelter | Charlotte Survival Shelter | Charlotte Underground Bunker | Charlotte Underground Shelter | Chicago Bomb Shelter | Chicago Fallout Shelter | Chicago Safe Room | Chicago Storm Shelter | Chicago Survival Shelter | Chicago Underground Bunker | Chicago Underground Shelter | Columbus Bomb Shelter | Columbus Fallout Shelter | Columbus Safe Room | Columbus Storm Shelter | Columbus Survival Shelter | Columbus Underground Bunker | Columbus Underground Shelter | Dallas Bomb Shelter | Dallas Fallout Shelter | Dallas Safe Room | Dallas Storm Shelter | Dallas Survival Shelter | Dallas Underground Bunker | Dallas Underground Shelter | Detroit Bomb Shelter | Detroit Fallout Shelter | Detroit Safe Room | Detroit Storm Shelter | Detroit Survival Shelter | Detroit Underground Bunker | Detroit Underground Shelter | Fort Worth Bomb Shelter |
2012 Shelters HardenedStructures HardenedSheltersLLC 877 486 0084 Toll Free